This ground improvement method uses ultra high-pressure jets to spray hardening agent forcefully through ground to form large-diameter soil cement piles. This high-speed installation is 10 times faster than conventional methods.
- Water cutoff
- Digging stability
- Increased bearing capacity strength
- Increased lateral resistance of pile
- Containment
- Preventing subsidence
- Mitigating liquefaction
- Preventing slippage
- Soil/slope retaining
- Jet Mixing
- Solidification
- Low displacement implementation
- Low vibration, low noise
- Space and height restrictions
