TRD Method (Continuous soil cement diaphragm wall method)

The TRD method forms a continuous wall in the ground by using a chainsaw type of cutter connected to a base machine. The cutter is moved laterally through the ground, digging a trench and filling it with hardening agent. There is no composite mixing with the soil in situ.

イメージ

Related material

Pamphlet