The TRD method forms a continuous wall in the ground by using a chainsaw type of cutter connected to a base machine. The cutter is moved laterally through the ground, digging a trench and filling it with hardening agent. There is no composite mixing with the soil in situ.
![イメージ](https://www.fudotetra.co.jp/en/wp-content/themes/fudoTetraEnTheme/assets/img/solution/img_soil_trd_01.jpg)